Smart Spare Parts
Manages critical spare parts with real-time visibility, preventing stockouts and optimizing inventory levels.
Consumables, rollers and line spare parts always available and recorded.

// The challenge
Paper and packaging plants consume a lot of consumables, rollers and line spare parts. If line supply fails, production waits.
// How it's used
Manages critical spare parts with real-time visibility, preventing stockouts and optimizing inventory levels.
Automates supply to production lines, ensuring every workstation always has the material it needs.
Automates MRO warehouse management with access control, real-time inventory and full traceability of every movement.
Simple system
Plug & play on your plant
24/7
Always operational
Full traceability
Every movement logged
ERP integration
SAP, Sage and more
100% automatic
No human intervention

Shelving with weight sensors that count and record every material movement in real time, no scanning needed.

3D cameras with machine vision that identify each part instantly, no tags or barcodes required.

Control inflows, outflows, alerts and access in real time from any device, feeding directly into your ERP.
No two factories are alike. We adapt the configuration to your space without construction work or structural changes, and the system learns your SKUs, whether a hundred or twenty thousand.
// What your plant needs
The operator learns nothing new. They just take what they need.

Card, code or fingerprint. Just like entering any zone today.

No scanning and nothing to note down anywhere.

Cameras and weight sensors record what left and how many units.

It appears on the dashboard and in your ERP, with name, quantity and destination.
// Process
Yes. Smart Production Supply automates supply to production lines so every workstation always has the material it needs.
No. 3D cameras with computer vision and weight sensors identify and count every item, with no labels or barcodes.
Yes. Every withdrawal is synced to your ERP with name, quantity and destination. We work with SAP, Sage and more.
8 weeks maximum from signing to go-live on site.
Send us the floor plan or the measurements of your storeroom and we'll send back an implementation proposal.